Case Studies

Real results from
real engineering teams.

See how organizations are transforming their operations with our products and implementations.

Filtered Dimension Extraction for Lift Manufacturing
Lift (Elevator) Manufacturing8-12 weeks

Filtered Dimension Extraction for Lift Manufacturing

80–90% reduction in manual effort per drawing, processing capacity scaled to 200 drawings per day, consistent two-sheet Excel output for every extraction

~5–10 mins
Manual effort per drawing
Hugarex: Enterprise Encryption & Key Management
Security8-10 weeks

Hugarex: Enterprise Encryption & Key Management

Customer onboarding was cut from 5 days to 10 minutes, 100% audit trail coverage achieved, and annual audit costs eliminated across a 3-continent key management operation.

10 minutes
Customer/product onboarding time
FAST: Facial Authentication Solutions Template
Security~10 weeks

FAST: Facial Authentication Solutions Template

Authentication latency cut to under 1 second, tenant integration reduced from weeks to 15 minutes, and passwordless login active for 5,000+ users across 3 enterprises with zero bypass incidents.

Under 1 second
Authentication latency
Automated Comparison of Customer Drawings and Recreated CAD Files
Manufacturing - Wind Turbine Components8-12 weeks

Automated Comparison of Customer Drawings and Recreated CAD Files

Verification turnaround time reduced from 3 hours to 15 minute, missing dimension detection improved to 93%, and manual review reduced to flagged discrepancies for quality engineers

15 minutes
Verification time per drawing pair
IE Skool: Digital Social Network & Courses Platform
EdTech8-10 weeks

IE Skool: Digital Social Network & Courses Platform

80% of 11 years of STEM curriculum digitized, 10,000+ students onboarded across 100+ schools, and 5,000+ certificates issued in year 1.

10,000+
Students on platform
Automated BOM Extraction for a Global Fleet of 700 Vessels
Marine10-12 weeks

Automated BOM Extraction for a Global Fleet of 700 Vessels

Procurement lead time faster by 36x, BOM review accuracy improved to 94%, and 36,000+ manual entry hours eliminated annually across a 700-vessel fleet

48-60 hours
Processing time per vessel
L&T Sufin: WordPress Schema Template Builder
Supply Chain3-4 weeks

L&T Sufin: WordPress Schema Template Builder

Engineering dependency removed from campaign page creation, 100% brand and SEO compliance automated on publish, delivered in 8 weeks for L&T Sufin's marketing team.

0 dev hours for standard pages
Engineering involvement per campaign page
Toni Rossi: Premium Shoe eCommerce Experience
Retail - Luxury Shoes8-10 weeks

Toni Rossi: Premium Shoe eCommerce Experience

Page speed up 2.5x, 3 product categories live, and Toni Rossi's team running 100% of catalog updates independently after moving from WooCommerce to Shopify Plus.

2.5x faster
Page load speed
From Manual Field Forms to Automated Solar Workflows with Microsoft 365
Engineering, Procurement, and Construction (EPC)8-10 weeks

From Manual Field Forms to Automated Solar Workflows with Microsoft 365

Manual processing time cut by 85%+, post-submission file work eliminated, and four-stage application visibility delivered across the PM Surya Ghar: Muft Bijli Yojana workflow on an existing Microsoft 365 license.

85%+ reduction
Post-submission processing time
Optimizing Project and Document Management Using Microsoft 365
Engineering, Procurement, and Construction (EPC)4-6 weeks

Optimizing Project and Document Management Using Microsoft 365

6 departments unified on Microsoft 365, file access reduced from 100% open to role-restricted, and all external sharing time-bound across 200+ users with reusable project templates in place.

6 of 6
Departments on a unified task system
Automated Ballooning for Engineering Drawings
Aerospace, Precision Manufacturing2-3 weeks

Automated Ballooning for Engineering Drawings

Annotation time cut from 2-4 hours to under 5 minutes per sheet, with AS9102 and PPAP-compliant inspection reports generated automatically

<5 mins (~95–98% reduction)
Annotation time per sheet
Real-Time Inventory Tracking with Automated Alerts
Manufacturing2-3 weeks

Real-Time Inventory Tracking with Automated Alerts

Stock visibility raised to 100% real-time, manual tracking effort cut by 70%, and automated threshold alerts reduced procurement response from days to minutes for a 300-person manufacturing team.

100% real-time across production and procurement
Stock visibility
Simplifying Leave Management for EPC Organization
Engineering, Procurement, and Construction (EPC)8-10 weeks

Simplifying Leave Management for EPC Organization

Monthly leave report compilation reduced from 8 hours to 0, 84+ departmental records centralized in a single view, and 200+ employees given direct access to balances and leave applications without HR intervention.

0 hours (on-demand generation)
Monthly report compilation time

Ready to write your
success story?

Let us show you how our intelligent systems can transform your engineering operations.

Contact Sales