Procurement lead time faster by 36x, BOM review accuracy improved to 94%, and 36,000+ manual entry hours eliminated annually across a 700-vessel fleet

A global marine organization managing 700 vessels struggled to extract Bill of Material (BOM) for engineering drawings and manuals for their fleet maintenance
Adeos extracts BOM and required information from engineering drawings and manuals, formatting and exporting the data directly to the MDM ERP system.
| Impact Metric | Before | After |
|---|---|---|
Vessel Processing Time | 3–8 weeks | 48-60 hours |
Extraction Accuracy | 60% | 90–94.2% |
Manual Data Entry | ~3,200 hrs/mo | ~160 hrs/mo |
Processing shipping documents manually is slow. The system got access to key BOM data and drastically cut down lead times for the maintenance and procurement teams.
Ready to see how our engineering-first AI solutions can streamline your operations and drive real impact?

One extraction workflow distributed to 3 departments, reducing per-drawing review from days to hours across a 50–100 drawing project cycle.

80–90% reduction in manual effort per drawing, processing capacity scaled to 200 drawings per day, consistent two-sheet Excel output for every extraction

Customer onboarding was cut from 5 days to 10 minutes, 100% audit trail coverage achieved, and annual audit costs eliminated across a 3-continent key management operation.