New Product Development (NPD) team engineers manual workflow bought down to 5% per day. NPD team communication improved in knowledge transfers, reducing repeated tasks, and solving major production bottlenecks from planning to execution with auto ballooning and report gen.

NPD team handles multiple data points from client drawings, requirements, deadlines and other feasibility bottlenecks on daily basis. Currently, the process engineers, machining and welding team, review the drawings manually. Reports are typed by multiple engineers to initiate the feasibility process in the shop floor and at supplier level.
When a client drawing is uploaded to ADEOS, it generates balloon numbers and extracts machining, welding specifications, along with standards, notes and BOM tables separately in seconds. Engineers can quickly review and understand the extracted information, verify requirements and plan the feasibility trials in days.
| Impact Metric | Before | After |
|---|---|---|
Engineers manual workflow | 80%/day | 5%/day |
Client drawing Throughput | 2 to 3 sheets/day | 20 to 25 sheets/day |
Inspection Report Preparation | 1 to 2 days | <15 mins |
Production Trial planning | 2 to 3 weeks | 48 to 36 hours |
ADEOS helps to improve the engineer's daily workflow by enabling them to analyse the drawings and generate the reports in minutes. This frees NPD engineers to focus on understanding customer requirements, identifying potential delays early, making informed decisions without assumptions and proactively communicating with internal stakeholders and clients.
Ready to see how our engineering-first AI solutions can streamline your operations and drive real impact?

PFMEA review time cut down to <15 min by automated comparison to the past quality issues and process failure modes from the knowledge bank.

Improved task tracking to 95% and project visibility, giving the team a clearer view of project progress and ongoing tasks.

Per-job turnaround targeted to drop from 3-4 days to under 3 hours, monthly capacity to scale from 12-20 to 75-80 panels, and duplicate item-master entries eliminated through automated de-duplication against Zoho ERP